Doing the whole job › Lesson 2 of 10 · 7 min read

Disassembly in the right order

A clock comes apart in one order and goes back in the reverse. The point of disassembly is not speed. It is to leave the movement in a state where you can see what is wrong, and to record enough that you can reassemble it exactly, a week or a year later. The sequence below suits most spring and weight clocks. Variations are listed at the end.

OrderActionRecord
1Remove pendulum and weights; secure the case.Photograph the clock as found.
2Remove the movement from the case.Note screws and brackets; refit loose screws to the case.
3Remove hands, then dial.Photograph each stage; note hand orientation.
4Let down springs (see releasing power).Count turns.
5Remove platform, hammers, strike levers.Photograph strike work as it stands.
6Draw or photograph the strike work and motion work.Mark positions.
7Part the plates and remove the trains.Lay parts out in order of removal.

Step 1 and 2: out of the case

Removal methods vary. A few common cases:

ClockMethodWatch for
LongcaseHood off, weights unhooked and set on soft packing, pendulum off. Release seatboard screws; lift the movement out, supporting the dial.The movement is front-heavy and will tip forward if unfastened. Keep a hand on the dial.
Vienna regulatorWeights off, undo the two knurled screws at the side of the seatboard, slide dial and movement forward.Pendulum stays in until the movement is out; the bracket is usually left with the movement for testing.
English bracketRemove the side screws that hold the movement brackets and slide the movement out of the back.The pendulum cock; lift carefully.
French slate or marbleRemove the back door, bell and pendulum, then the screws in the door frame; hold the front door as you unscrew.The dial and movement slide out together.
Dial clockUnhook pendulum; remove the dial pegs; lift out dial and movement together.The dial falls forward once the last peg goes.
Post-1900 mantelRemove the hands first, then reach in with a long screwdriver and undo the corner screws.Replace the screws in their holes so they are not lost.
Four-glass French clockSlacken the screw behind the 6; turn the dial until the pins pass through its cut-outs; lift out dial and movement.Keep the glass panels taped.

Put loose screws back in their holes, or tape them to the case, with the job number written beside them. Take care that replacements are the correct length. A screw that is too long will burst through the front of a case.

Step 3: hands and dial

Hands

Photograph the hands in position, then note which hole or arbor the second hand uses. Remove in order: second hand, minute hand (after any nut or taper pin), then the hour hand.

Never twist and pull at the same time on a hand; you will bend the tube or the hand. Give a drop of oil at the centre of a stuck hour hand and wait.

Dial

Dials are held by taper pins, by pivoting clips riveted to the plate, by spring clips or by dial feet. Remove taper pins from the small end. Do not lever from the edge of the dial or you will chip enamel or crack paint. Some dials sit on a false plate; unpin the false plate from the movement and leave the dial on it unless the dial needs work.

Lay the dial face up on soft cloth in a labelled box. Put the pins in the box.

Step 4: let down the power

With the dial off, you can reach the ratchets and winding squares safely. Follow the lesson on releasing power. Record how many turns each spring took to let down: this tells you how much running time it had and whether the spring is sound.

Step 5 and 6: record the work before it comes apart

Strike and motion work are the parts most likely to go back wrongly. Before you take them off, photograph them from two or three angles with the movement in the same orientation each time, or draw them, with these features marked:

SystemMark or photograph
Rack and snailRack tail position on the snail, rack hook position, gathering pallet and pin position, lifting piece, locking and warning pins.
CountwheelCountwheel slot position when locked, warning wheel pin position, lifting piece position, lock lever position.
ChimeChime barrel pins, the "start of run" marks, hammer tails, chime selector.
Motion workMinute wheel and hour wheel meshing; cannon pinion fit.
Escapement and crutchAnchor pivot position, crutch fork and pin, pallet depth, the beat setting.
Click workClick, click spring and ratchet wheel orientation.

On a countwheel clock note the position of the lock lever in the notch and the position of the pin on the warning wheel. When you reassemble you will set the strike to those marks.

Also photograph any assembly that could go on in more than one way: a bush with an oil sink on a particular side, the angle of a lifting piece, the orientation of the ratchet wheel.

Step 7: parting the plates

  1. Remove the platform, hammer arbors, bell stand, strike levers and fly if they are outside the plates.
  2. Remove the ratchet wheels and click springs. Note orientation.
  3. Release the plates: taper pins at the pillar ends (press from the small end), or nuts or screws.
  4. Lift the front plate gradually and evenly. Wheels may stick to it; be ready to catch them.
  5. Lay the wheels in the order of removal on a tray: great wheel, second wheel, centre wheel, third, escape wheel, and so on, with their pinions facing the same way.
  6. Take the strike wheels in order the same way, including the locking wheel and the warning wheel.
  7. Remove springs and barrels last; take care to hold a barrel closed until you decide to open it.

When you lift a train from the plates, note which pivot goes into which hole. Pivots of different sizes make this obvious, but not always; a number marked in the plate can save an hour.

Marking parts and containers

Marks should be discreet, small and reversible. Use dots made with a punch on a hidden surface: one dot on the first wheel of a train, two on the second, and so on, or a number scratched lightly on a surface that will not be visible. Never mark a dial or a visible surface.

ContainerUse
Egg boxes or compartment traysOne compartment per train, in order of position.
Small labelled potsPins, screws, washers, springs.
Dial boxDial, hands, pins, glass, held separately.
Clean tray with clothThe plates when set down; avoids scratches.
Job boxEverything for one clock together, tagged with the job number.

Keep each train's parts in order: wheel, pinion, collet, pivot protectors. Put a piece of pith or pegwood over delicate pivots to protect them. Return screws to their threaded holes if possible.

Variations by clock type

Common mistakes. Letting wheels fall from the plate when it is lifted; losing taper pins; mixing pivots between wheels; forgetting to photograph the strike work; marking visible surfaces.
Sources

The procedures, clearances and sequences in this lesson are typical workshop practice and vary between restorers; no published standard is cited for them.

Get new lessons by email

Free, practical clock repair lessons for beginners. No spam, unsubscribe any time.